Home > Checklists > Checklist – Site inspection for defect reporting
1.1 Have all cabinets been installed?
1.2 Have all doors been adjusted?
1.3 Have all the fillings been sealed?
1.4 Have all the shelves been installed?
1.5 Have the cabinets been cleaned?
1.6 Has all the hardware been installed?
1.7 Has all the excess woodwork been placed in the hallway?
1.8 Have all the adhesive dots been attached?
2.1 Has the dishwasher panel been installed?
2.2 Has the kicker been installed?
3.1 Have all cabinets been installed?
3.2 Have all doors been adjusted?
3.3 Have all the shelves been installed?
3.4 Have all the fillings been sealed?
3.5 Have the cabinets been cleaned?
3.6 Has all the hardware been installed?
3.7 Has all the excess woodwork been placed in the hallway?
3.8 Have all the adhesive dots been attached?
4.1 Have all doors been installed?
4.2 Are all the doors tight?
4.3 Has all the hardware been installed?
5.1 Have all cabinets been installed?
5.2 Has all the hardware been installed?
5.3 Have all doors been installed?
5.4 Are all the doors tight?
5.5 Have all the adhesive dots been attached?
Comments
Name and Signature