Checklist – Completed Works Site Inspection

Notice of completion

Has the kitchen been installed to the highest standard?

1.1 Have all cabinets been installed?


1.2 Have all doors been adjusted?


1.3 Have all the fillings been sealed?


1.4 Have all the shelves been installed?


1.5 Has all the hardware been installed?


1.6 Has all the excess woodwork been placed in the hallway?


1.7 Have all the adhesive dots been attached?


1.8 Are the cutouts complete?


1.9 Has the kicker been installed?


1.10 Have the cabinets been cleaned?

Dishwasher Integration Completed

2.1 Has the dishwasher panel been installed?

Bathroom / ensuite

3.1 Have all cabinets been installed?


3.2 Have all doors been adjusted?


3.3 Have all the shelves been installed?


3.4 Have all the fillings been sealed?


3.5 Has all the hardware been installed?


3.6 Have all the adhesive dots been attached?


3.7 Have the cabinets been cleaned?


3.8 Has all the excess woodwork been placed in the hallway?

Bi-fold laundry

4.1 Have the jambs been installed?


4.2 Have all the fillings been sealed?


4.3 Have all doors been installed?


4.4 Are all the doors tight?


4.5 Has all the hardware been installed?

Linen closets

5.1 Are all the doors tight?


5.2 Have all doors been installed?


5.3 Have all the adhesive dots been attached?


5.4 Has all the hardware been installed?

Bed a robe

6.1 Have all cabinets been installed?


6.2 Have all the fillings been sealed?


6.3 Have all doors been installed?


6.4 Are all the doors tight?


6.5 Have all the shelves been installed?


6.6 Have the cabinets been cleaned?


6.7 Has all the excess woodwork been placed in the hallway?

Bed two robe

7.1 Have all cabinets been installed?


7.2 Have all the fillings been sealed?


7.3 Have all doors been installed?


7.4 Are all the doors tight?


7.5 Have all the shelves been installed?


7.6 Have the cabinets been cleaned?


7.7 Has all the excess woodwork been placed in the hallway?

Bedrobe three

8.1 Have all cabinets been installed?


8.2 Have all the fillings been sealed?


8.3 Have all doors been installed?


8.4 Are all the doors tight?


8.5 Have all the shelves been installed?


8.6 Have the cabinets been cleaned?


8.7 Has all the excess woodwork been placed in the hallway?

FINISH CHECKLIST

Comments

Name and Signature